Home Contact Us 中文版
 
   
Search
 

Dawan and Zhongling coal mines

Author:    Add Time:11/8/2007 6:03:40 PM    

General Information

 

Full Mine Name:

Dawan and Zhongling coal mines

Project Type:

Combined Heat and Power (CHP)

Region/State/Province/Coal Basin:

Guizhou; Dawan in Dawan Town, Zhongshan District, Liupanshui City and Zhongling in Zhongling Town, Nayong County, Bijie Area

Status of Mine:

Active (underground)

Project Status:

Operating

Project Information Source(s):

CDM-PDD, 2006-09-20

Technical Information:

 

First Year of Project Operation:

2004

Estimated Project Lifetime:

20 years

Type of Mine Ownership:

Public-State

Installation Capacity:

By 2008, 12.5MW (Dawan) and 18 MW (Zhongling)

Quantity of Gas Sold per Year (million cubic meters):

N/A

Annual Greenhouse Gas Emissions Avoided per Year (metric tonnes of C equivalent):

512,094 tCO2e

Crediting Period of Emission Reduction:

2004-2013

Equipment used:

500 kW Chinese-built CMM fueled engine generators, Water Ring Vacuum pump

Project Partners:

 

Mine Owner:

State-owned

Mining Group(s):

Shuiching Mining (Group) Co., Ltd

Parent Company Name:

N/A

Project Developer:

Shuiching Mining (Group) Co., Ltd

Equipment/Technology Vendor(s):

Unknown, domestic

End-User(s):

Self-use by the mining area

Funding Source(s):

Shuiching Mining (Group) Co., Ltd

Other Parties Involved:

Energy Systems International, B.V.

Methane Drainage:

 

Number of Drainage Wells at Mine:

N/A

Number of Ventilation Shafts at Mine:

N/A

Type of Drainage System:

Underground boreholes, gas drainage galleries, extraction pumps

Total Volume of Methane Drained:

 

Year

Million Cubic Meters

N/A

N/A

Total Volume of Methane Ventilated:

 

Year

Million Cubic Meters

N/A

N/A

Total Volume of Methane Used:

 

Year

Million Cubic Meters

2008

5.78

Methane Concentration in Drained Gas:

 

Year:

Average % Total Volume:

N/A

N/A

Methane Concentration in Ventilation Air:

 

Year:

Average % Total Volume:

N/A

N/A

Contact Information:

 

Contact Name:

Binghu Zhu

Contact Title:

Vice Director

Email Address:

Zbh0821@tom.com

Telephone Number:

0858-8179299

The format of this Project Data was derived from the Methane to Markets International Coal Mine Methane Projects Database, which can be found at http://www.epa.gov/methanetomarkets/.  The data was retrieved from the UNFCCC Project Design Document Form (CDM-PPD) for a Clean Development Mechanism Project.



 
   © 2007 GZCMM All Rights Reserved   Design By:Esunbow